Bathroom Renovation Projects

What sits behind the tiles matters most—properly graded screeds, compliant waterproofing and crisp tiling built to last.

Modern Australian bathroom renovation with frameless walk-in shower, floor-to-ceiling porcelain tiles and timber vanity

Service Overview

Bathrooms pack more trades per square metre than almost any other room in a building, and hidden shortcuts in substrate framing, puddle flanges or waterproofing membranes are among Australia’s costliest residential building defects.

Our Bathroom Renovation Projects service prioritises structural soundness and compliant wet-area waterproofing (aligned with AS 3740 and NCC requirements) before a single tile is laid. From compact inner-city ensuites to family bathrooms with walk-in hobless showers, we coordinate strip-out, framing corrections, plumbing, electrical, waterproofing, tiling and custom vanities cleanly.

What This Service May Include

Confirmed line-by-line against your project drawings & contract specification

  • Complete strip-out back to framing/masonry and inspection of subfloor and wall framing
  • Timber noggings for vanities, towel rails, frameless shower screens and future grab rails
  • Relocated or upgraded hot/cold water rough-in, floor wastes, linear drains and in-wall mixer bodies
  • Underfloor heating rough-in (where selected), exhaust ventilation ducted externally and heated towel rail wiring
  • Wet-area wall/floor linings, waterstop angles, puddle flanges and multi-coat AS 3740 compliant waterproofing with flood/cure hold points
  • Sand-cement screeding, floor-to-ceiling or feature tiling, mitred edges, custom vanity, frameless glass, mirrors and sanitaryware fit-off

Risk Prevention

Common project pitfalls—and how we manage them.

Common Challenge

Previous water leaks having rotted wall studs or subfloor joists beneath old shower bases.

Structured Response

After full strip-out back to bare framing, timber/substrate condition is inspected and repaired properly before new wet-area sheeting goes up.

Common Challenge

Flat shower floors that pool water or splash out into the main bathroom.

Structured Response

Screed beds, linear or point drains and waterstop angles are set out carefully to achieve positive falls to waste.

Common Challenge

In-wall cisterns, mixer bodies or recessed shaving cabinets ordered too late for framing stage.

Structured Response

All concealed rough-in bodies and recessed niches/cabinets are confirmed and on site before strip-out begins.

Delivery Pathway

How we deliver bathroom renovation projects.

  1. 1

    Fixture Lock-In & Site Check

    Confirm layout, subfloor type and have all rough-in tapware, drains and tiles selected ready for start.

  2. 2

    Strip-Out & Framing Prep

    Demolish back to bare structure, repair any moisture-affected framing and install solid wall noggings.

  3. 3

    Plumbing, Electrical & Sheeting

    Rough-in concealed mixers, wastes, exhaust ducting and power, then install wet-area linings.

  4. 4

    Waterproofing & Tiling

    Install waterstops/flanges, apply compliant waterproofing with full cure times, lay screeds and complete tiling/grouting.

  5. 5

    Glass, Fit-Off & Handover

    Measure/install shower screens and mirrors, fit vanity and tapware, silicone seal and complete final check.

Before You Build

Key considerations.

Waterproofing membranes have mandatory drying and curing times between coats and before tiling—never rush this hold point.

Step-free (hobless) walk-in showers look clean and improve lifelong accessibility, and are best planned before subfloor/screed levels are set.

Adding timber noggings behind tiles during framing costs very little and allows future grab rails or heavy accessories to be mounted securely.

Large-format porcelain tiles require flat wall framing and experienced layout set-out so cuts around niches and wastes align cleanly.

Note: Specific deliverables, geographic availability, authority approvals and statutory contract terms are confirmed in writing after reviewing your site and project documentation.

Recommended Guide

Questions to Ask a Builder Before Signing a Contract

Good builders welcome thorough questions before a contract is signed. Use these ten practical questions to check inclusions, allowances, supervision and variation rules.

Read guide (7 min read) →

Frequently asked questions: Bathroom Renovation Projects

Can you tile over existing bathroom tiles to save money?

We generally recommend stripping back to substrate so concealed waterproofing, waterstops, puddle flanges and framing condition can be verified properly rather than hiding old membranes.

Do I receive waterproofing compliance documentation?

Yes, wet-area waterproofing is completed in accordance with Australian Standard AS 3740 / NCC requirements with applicable compliance documentation provided for your records.

Should we supply our own tapware and tiles, or do you specify them?

Either works—we provide a clear fixture checklist with required specifications (such as WELS ratings, slip ratings for floor tiles and compatible rough-in bodies) so everything arrives on time and fits.

Next Step

Discuss your bathroom renovation projects brief.

Request a consultation or quote with Bathroom Renovation Projects pre-selected in our enquiry form.